Fastener production equipment
FINEX Fastener Production Equipment

Screw Making Equipment---78 sets

Covering a variety of machines with different functions, it can produce different screws from M1.2-M10 (from small precision micro screws to large bolts)

Other special models, such as washer Driver, Grooving Machine, Tail Cutting Machine, etc., are suitable for the production of various secondary processing procedures.

machine with an average daily production capacity of 200K/set (20 hours) ~ 60K/set (20 hours)

Total production capacity of screw machine: 136240K/month (26 days)

screw equipment
screw equipment 01
Qucik delivery---5~7working days

1) Below M3, MOQ: 50K/batch, delivery cycle 5~7 working days

2) M3.5~M6, MOQ: 30K/batch, lead time: 5~7 working days

3) Non-standard special-shaped products, MOQ: 50K/batch, lead time: 10~15 working days

(Non-standard screw products involve mold opening and customized materials, and an additional 1 week of working days is required)

Sufficient Equipment ---50 sets
  • 28 sets of automatic lathes, suitable for turning nuts, studs, rivets, sheet metal riveting parts, etc. of various materials, with an outer diameter of 1mm~20mm
  • 3 sets of CNC machines, suitable for turning pins and shafts of various materials, suitable for outer diameters below 9.5mm and lengths within 100mm
  • 8 CNC lathes, suitable for turning high-precision size products of various materials, with an outer diameter ranging from 1mm to 50mm
  • There are 10 tabletop lathes for various secondary processing, which are suitable for post-processing such as turning (grooving), drilling, tapping, chamfering, and edge milling.
lathe equipment
CNC machining equipment
Sufficient production capacity----10135K/month

Automatic lathes and CNC parts:

  1. The monthly production capacity of copper nuts is 10135K/39 machines/26 days
  2.  The monthly production capacity of non-standard parts is 3336K/28 machines/26 days
  3. Annual output value can reach: about 50 million yuan

Automatic lathe and CNC parts: the minimum order quantity is 10K/batch

delivery cycle: starting from 3 working days,partial delivery can be start

Scroll to Top